The Forum Istanbul Shopping Center, established in Bayrampasa-Istanbul, is the largest shopping center of Turkey and Europe with a total construction and leasable areas of 495.000 and 175.000 square meters respectively and in the meantime, 265 domestic and foreign brands.
The design of the project is formed from iconic structures, effective domes and spacious boulevards for a rich visitor experience. The concept design of Forum Istanbul has been the company , T+T design from Holland, architectural concept, however , BDP from United Kingdom, Chapman Taylor from Spain and ERA from Turkey.
Within the scope of the project, all construction works has taken up in the inner shell. Besides of this all flooring works for hard landscaping areas finished. In the scope of fine works, 695 pose of different construction works are completed successfully.
The first store that leading firm of the global sporting products Decathlon has effectuated in Turkey has a covered area of 5.000 square meters within the scope of the Forum Istanbul Shopping Center Project. There are also covered and open parking lots, sporting halls, exhibition areas taking place within the store Decathlon. The Administrative Office Complex Building which is a part of Forum Istanbul Shopping Center 2nd Phase Constructions, is a 14 floors building with 1250 square meters housing space and 19.200 square meters covered area. In the scope of The Administrative Office Complex Building Project open parking lot of 30 vehicle capacity and garden landscaping works have been carried out. In the scope of Decathlon and The Administrative Office Complex Building Project all facade and fine construction works completed.
As of its era, Forum Istanbul Shopping Center which was one of the most diffucult projects in the mean of architectural and technical, has been a project of harmonic works for multidiciplinary works as Technical Works, Quality, Administrative Control and Procurement.